The River Road project in Wimberley is ahead of schedule and due to open in the next couple of days. The project includes the stamped wall, the stamped concrete rip rap, and cut boulders installed for side of road. This is a major improvement for River Road which was severely damaged by the Memorial Day Flood in 2015. Myers Concrete is proud to be a part of this project in our hometown.